All Socket Crosses
Delivery term:The date of payment from buyers deliver within days-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Beijing
-
Validity to:
Long-term effective
-
Last update:
2017-10-20 17:10
-
Browse the number:
112
+
Qingdao Nancy Metal & Machinery Co. Ltd
- Contactaixin:
Contactaixin:
nancymetal(Ms.)
- telephone:
-
Area:
Beijing
Address:No. 138 Dunhua Road, 1303, Eurasian Center,Shibeiqu,Dingdao,, Shandong,China, Qingdao, Shandong, China (266034)
- Website:
+
Model Number: NMM-XX-037-#6791
Brand Name: NMM or OEM
Key Specifications/Special Features:
All socket teeMaterial:1)Body/loosing flange:Ductile iron grade500-7/450-12inaccordancewithISO10832)Gasket:RubberEPDM inaccordancewithEN681.1Technical data1)Working pressure:PN10, PN16, PN25,PN40
2)Fluid temperature:0°C-50°C, excludingfrost
3)DimensionsandtestinginaccordancewithISO 2531/EN545
Surfacetreatment:
External coatings:
1)Zinccoating+bitumenpainting
2)Liquidepoxypainting
3)EpoxyappliedbyFBE
4)Accordingtocustomers'requirements
Internal coatings:
1)Cementmortarlining
2) Liquidepoxypainting
3)EpoxyappliedbyFBE
4)Accordingtocustomers'requirements
Note:
1)Push-in joint can assembled by pushing the spigot through the gasket in the socket of the mating component, and permits significant angular deflection both during and after installation and which can accept a light offset of the centreline
2)Fluid temperature:0°C-50°C, excludingfrost
3)DimensionsandtestinginaccordancewithISO 2531/EN545
Surfacetreatment:
External coatings:
1)Zinccoating+bitumenpainting
2)Liquidepoxypainting
3)EpoxyappliedbyFBE
4)Accordingtocustomers'requirements
Internal coatings:
1)Cementmortarlining
2) Liquidepoxypainting
3)EpoxyappliedbyFBE
4)Accordingtocustomers'requirements
Note:
1)Push-in joint can assembled by pushing the spigot through the gasket in the socket of the mating component, and permits significant angular deflection both during and after installation and which can accept a light offset of the centreline
Shipping Information:
- FOB Port: China (Mainland)
- Lead Time: 10 - 60 days
Main Export Markets:
- Asia
- Australasia
- Mid East/Africa
- Western Europe